Requests for Observing Time on the DAO Telescopes
The deadline for applications for time on the DAO 1.2-m and 1.8-m telescopes for the first quarter of 2027, 1 January through 31 March, is November 30, 2026.
The 1.2-m DAO Telescope can be used for robotic observations with its McKellar spectrograph while the Plaskett 1.8-m Telescope is available for robotic imaging or manual spectroscopy observations.
The 1.2-m McKellar spectrograph has two optical paths available (32-inch or 96-inch focal lengths) and can provide spectra with dispersions between 40.9 Ang/mm and 2.4 Ang/mm with wavelength coverage determined by the ~60mm CCD. A new CCD sensor, the Fletcher, is available for use on both optical paths of the spectrograph. The Fletcher CCD features lower dark current and read noise, as well as a quantum efficiency (QE) 50% higher than that of the previous detector, the SITe-4. The latter remains in use as a back-up detector. For more details, see: https://astroherzberg.org/1-2m-telescope-overview/
The 1.8-m spectrograph dispersions range from 120 Ang/mm and 10 Ang/mm with wavelength coverage limited by the 26 mm long SITe-2 CCD.
Most 1.8-m imaging programs are currently carried out with SDSS filters but Johnson/Kron-Cousins filters may also be available depending on scheduling constraints. The imaging FOV is 23.9' x 10.6' and the E2V-1 detector is normally binned by a factor of 2 for a scale of 0.6" per binned pixel to adequately sample the typical 2" seeing at the DAO.
More information about the telescopes can be found here: https://astroherzberg.org/daotelescopes/ and https://nrc.canada.ca/en/research-development/nrc-facilities/dominion-astrophysical-observatory-research-facility. If you are interested in applying for time, please contact me (deborah.lokhorst@nrc-cnrc.gc.ca) to obtain a LaTeX template for your proposal. Dmitry Monin (dmitry.monin@nrc-cnrc.gc.ca) and I can also provide more information about each telescope's capabilities and limitations. For example, the 1.8-m telescope has a number of pointing restrictions required for safe robotic operation.
Comments